A lot of my time in October was spent working on Christmas Quilts for Hospice with PCQ and the community service committee. Not many photos to show for it, but I hope to have more photos later in November. 

My big finish this month was my Stay-at-Home Round Robin, started in 2020. 

Fabric usage for the front was already counted in April, and for the pieced back was counted in June. I bought a half yard of black for the binding and immediately used it, so that was a wash. I did find the khaki grid print I need for Road Trip and got the last yard of it from Etsy. Other than that, there wasn't much activity with the stash report this month. 

My niece is expecting a baby boy any day now. I thought I had longer, but no. So I quickly pulled together a palette featuring her preferred color, teal, and kitted it up to work on at retreat. Retreat starts tomorrow, so I can get to work on it right away. 

October Stash Report: 

IN this month: 1-1/2 yards (Khaki grid from Etsy, 1 yard. Black to bind Red Stay-at-Home Round Robin, 1/2 yard)
OUT this month: 1/2 yard (binding for Stay-at-Home Round Robin)

IN YTD: 49-1/2 yards
OUT YTD: 107-1/4 yards

YTD Net change: 57-3/4 yards OUT

Goals Update: 

October Goals:

1. Prep for and teach the final two color classes. Plan shopping trips with the students. Done.

2. Bind three Xmas quilts for Hospice. Done, quilted two more and bound five so far. 

3. Continue working on the Kaffe Gradient project to the point it can be packed up to finish at retreat in November. Project is packed for retreat but I'll have to put the parts on the wall there to check for which sashing color comes next. 

4. Plan pillows for my son's sofa, requested for Christmas, and kit it up to make at retreat. Done, two pillow covers cut and kitted up.

5. Put Road Trip blocks on the wall, work on layout, and figure out what else is needed. Progress

6. Quilt the Stay-at-Home round robin. Quilted, bound, labeled and finished. 

Other: planned, cut and kitted up a baby quilt for niece's soon-to-come baby boy. 

November Goals: 

1. Have fun at retreat Nov 2-5.

2. Make baby quilt for niece's baby: assemble flimsy at retreat, quilt at home ASAP.

3. Make pillows for my son for Christmas.

4. Finish assembling the Kaffe Gradient flimsy. 

5. Continue working on the layout for Road Trip.

6. If needed, bind more Christmas for Hospice quilts.

7. Quilt something on PCQ's long arm.

Retreat will give me a chance to focus on the baby quilt and the pillows; hopefully I can knock out the baby quilt flimsy and two pillow covers with zippers while I'm there. I'm taking along the Kaffe Gradient project in case I have extra time and I need another project to work on. 

After that, November will be a busy month. We have visitors coming after I get back from retreat. Then there are some Color Class wrap up commitments with a couple of my students for some one-on-one coaching. DH is celebrating a milestone birthday so we're planning a little trip, and we'll get together with some special friends. I have time booked on PCQ's long arm before Thanksgiving so I need to prep whatever I'm going to quilt.

I hope November is as productive as anticipated - wish me luck! 