A new version of Scrappy Celebration with friends, this time in batiks with black, got me sidetracked this month. In addition, my color classes are mostly one week apart this time instead of two weeks apart, so a lot of my time has been spent reviewing and updating my previous lesson plans and prepping for teaching. Therefore, not a lot of progress was made on some of my other projects.
Stash Report:
IN this month: 0
OUT this month: 7-1/4 yards (Backing for patriotic Scrappy Celebration, 2 yards wide backing. Test blocks for Edna's pattern, 7/8 yard. Pattern test sample for Edna's Stars, 4-3/8 yards)
YTD Net change: 7-1/4 yards out.
Fabrics being used for batik Scrappy Celebration have not been counted. When the top is complete, we'll estimate the total consumption and divide by the number of participants.
Goals Update:
January Recap:
1. Prep for and teach first two sessions of Color Class. DONE
2. Finish the Kaffe Gradient top. No, not touched.
3. Continue working on Road Trip. Worked on layout and filler blocks. Not happy with the result.
4. Work with Edna to draft her pattern. Make test sample. DONE.
5. Work on a UFO or an Adopt-a-Quilt. Not done
Other: Made more than 20 blocks for Scrappy Celebration 4 in batiks with black.
February Goals:
1. Continue prepping for and teaching weekly color classes.
2. Continue making blocks for SC4.
3. Finish the Kaffe gradient flimsy.
4. Figure out a plan for how to salvage Road Trip.
I'm keeping the list short this time because it's a short month and I have four color class lessons to prep for. Wish me luck!