Friday, May 1, 2026

April Stash Report and Goals Update

April was a fun and productive month! I got a lot done at retreat, had a wonderful time with friends, and replenished my stash of white-on-whites, low volumes, and blenders. The big accomplishment this month was getting my Diabolical Jane top pieced. There was a minor hiccup due to all the bias, and I've learned a few things I'll do differently with my next one, but it was so satisfying that there will definitely be a next one. 

Also at retreat I was able to assemble a pastel and white16 patch baby quilt. Many of the colors were leftover strips from my Opal-Inspired baby quilt. The blocks were already made; I just had to add sashing and cornerstones. 

With tops finished and fabric purchased there were certainly some changes to my stash report this month. 

April Stash Report: 

IN this month: 17 yards (4 yards from Edna for DJ back. 9-1/2 yards from Ritter, includes FQs won. 1/2 yard from Hobby Lobby. 3 yards from Prickly Pearadise.)
OUT this month: 8-5/8 yards (Diabolical Jane top, est. 5-1/4 yards; does not include unused cut pieces. Pastel/white baby quilt top, 3-3/8 yards.)

IN YTD: 52-1/2 yards
OUT YTD: 43-3/8 yards

YTD Net Change: 9-1/8 yards IN

That's okay, there's still a lot of time left in the year to use up more than I add. My yearly goal is always to reduce stash or break even. 

Goals Update: 

April Recap: 

1. Participate in long arm learning and playtime event on Apr 4th. Yes, FUN! Got over my fear of deviating from my go-to meander. 

2. Attend retreat Apr 9-13 and have a good time. YES!!!

3. Assemble Diabolical Jane at retreat. Yes, completely finished the top.

4. Prep the confidential project for quilting: pick paper bits out of the back, wash and iron the backing fabric, get batting.  Done. 

5. Quilt the confidential project on April 17. Done. 

6. If time permits, assemble the other pastel and white baby quilt. Yes, completed the top at retreat. Also found backing fabric in the club's stash and prepped the backing. 

7. If time permits, assemble the purple Nine Patch and Plus project, now called Amber and Aubergine. Progress, worked on it at retreat and at home, top almost complete.  

8. Work on the Mary's Triangles project at social sewing. Yes; only one day of social sewing this month.

Other: started pulling fabrics for another Diabolical Jane.

May Goals: 

1. Prep for teaching X and Plus class; teach on May 30. 

2. Square up the confidential quilt and prep binding. 

3. Start planning and cutting for Eric's Christmas tree project to work on at retreat in July. 

4. Quilt and bind white and pastel 16 patch baby quilt. 

5. Prep backing for purple Diabolical Jane top. 

6. Finish assembling the Amber and Aubergine top.

While it looks like just a few simple goals for May, there's actually quite a bit of time and work involved in some of them so I'm limiting the list to just these. 





3 comments:

  1. Wow, it both looks and sounds like a really great month. I hope May brings just as much fun.

    ReplyDelete
  2. Congratulations on all the progress last month. Good luck with your plans for May.

    ReplyDelete
  3. You won again?!?!? DJ looks stunning, absolutely stunning! Can’t wait to see what color palette you go with.

    ReplyDelete